← NRC enforcement actions

NRC CAL – NOV (White)

EA-13-125 · CAL · Issued 2013-08-09 · Reactor Licensees

Action

EA Number
EA-13-125
Licensee
NOV (White)
Category
Reactor Licensees
Action type
CAL
Date issued
2013-08-09

Description

On August 9, 2013, the NRC issued a Notice of Violation (NOV) to NextEra Energy, Point Beach, LLC for a violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," associated with a White Significance Determination Process finding involving the failure of Point Beach personnel to have a procedure appropriate to the circumstances to address flooding as described in the Final Safety Analysis Report (FSAR). Specifically, from January 19, 1996, to March 13, 2013, procedure PC 80 Part 7, "Lake Water Determination," as implemented, would not protect safety-related equipment in the turbine building or pump house because the procedure: (1) did not appropriately prescribe the installation of barriers such that gaps between the barriers were eliminated to prevent water intrusion, (2) did not protect equipment by requiring barriers to be placed in front of the doors, from 1996 to 2008, as described in the FSAR, and (3) did not require the barriers to protect the plant to an elevation of at least 9 feet as described in the FSAR.

Source

Full letter
PDF on NRC ADAMS
NRC index
Reactor Licensees enforcement actions
Machine
JSON-LD · Markdown